国产精品亚洲一区二区在线观看-在线黑人抽搐潮喷-久久人人爽天天玩人人妻精品-亚洲日韩av一区二区三区四区-永久不封国产av毛片

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Wind pressure testing machine

  • Hot Line:18322499311

Highlight-color: rgba(255, 255, 255, 0); margin: 0px; color: rgb(102, 102, 102); font-family: "microsoft yahei", 宋體, Arial; font-size: 14px;">



1、 Main functions of the device:

The Wind pressure testing machine is used to determine whether the equipment can maintain structural integrity and work in high wind speed environments. It is mainly suitable for evaluating equipment working outdoors in mountainous, coastal, island, and other areas, as well as equipment placed on the open deck of ships for work.


2、 Performance indicators and system composition of wind pressure testing machine:


Model GC-FY-80

Sample restrictions: This testing equipment prohibits the testing of flammable, explosive, and volatile substance samples; Testing for storing samples of corrosive substances, testing for storing organisms, testing and storing samples of strong electromagnetic emission sources

Main technical parameters

Environmental conditions for use: ambient temperature of 5-35 ℃, relative humidity ≤ 85% RH

Blow off cross-sectional area 1000mm × 1000mm (fan outlet cross-sectional area)

Wind speed (0-45) m/s (wind speed at the outlet of the fan) adjustable

Air volume: 110600-181800m3/h (1843-3030m3/min)

Wind pressure 951-1402 Pa

Maximum specimen size ≥ 2000mm × 2000mm

The external dimensions of the machine are approximately 4200 × 3700 × 1500mm (W * H * D)

Sample Placement Room

To avoid the influence of surrounding air flow on the wind direction, the sample is placed in a closed room and the laboratory is sufficiently large. The horizontal dimension is at least 3 times the length of the sample placement, and the vertical and vertical dimensions are at least 2 times the length of the sample placement. An automatic pressure relief device or exhaust duct is also installed indoors

Test meets the conditions GJB150.21A-2009 Military Equipment Laboratory Environmental Test Methods Part 21: Wind Pressure Test

GB/T2423.41-94 Basic Environmental testing procedures for electrical and electronic products: Wind pressure test method

Maximum power 75KW

Maximum current of 120A

 

Power supply conditions

And power supply

AC 380V three-phase four wire+protective grounding; The allowable voltage fluctuation range is 10% V;

The allowable frequency fluctuation range is 50 ± 0.5HZ; TN-S power supply or TT power supply

The grounding resistance of the protective grounding wire is less than 4 Ω

Require users to configure corresponding capacity air or power switches for the equipment at the installation site, and this switch must be independently controlled. When placing powered samples in the equipment use box, please use an external power source for the sample power supply and do not directly use the local power supply;

The machine structure adopts a volute centrifugal fan as the power source

The snail shell is made as an assembled type, with a rotating air outlet angle that can be adjusted by ± 90o

Install a lifting frame at the bottom of the fan, which can be raised and lowered vertically with an adjustable range of 0-1000mm

Electrical control system

Centrifugal blower as power source, easy to use and maintain

The speed control of the fan adopts a frequency converter and a variable frequency motor to control the motor speed, achieving the purpose of controlling the wind speed

Requirements for storage, transportation environment, and installation site

Storage environment requirements: The equipment environment temperature should be maintained within 0 ℃ to+35 ℃

The installation site requires that the distance between the left, right, and rear wall panels of the test box and the wall should not be less than 800mm, and the distance between the front and the wall should not be less than 1000mm. When transporting equipment, whether it is possible to enter the entrance or passage, elevator, etc., to avoid affecting the progress of your company's project.

Transportation method: Whole machine transportation



Recommended products

主站蜘蛛池模板: 躁躁躁日日躁| 中日韩中文字幕无码一本| 免费人成自慰网站| 亚洲人精品午夜射精日韩 | 国产麻豆精品传媒av国产| 无遮挡h肉动漫在线观看| 成人国产精品一区二区网站公司| 天天狠天天透天天伊人| 少妇午夜啪爽嗷嗷叫视频| 久久av无码aⅴ高潮av喷吹| 久久欧美国产伦子伦精品| 国产精品夜色一区二区三区| 亚洲欧美日韩国产综合在线一区 | 玩弄少妇肉体到高潮动态图 | 亚洲精品久久久久久动漫器材一区 | 97人人添人澡人人爽超碰| 欧美人成片免费看视频| 国产女主播高潮在线播放| 精品久久人人妻人人做精品| 性做久久久久久| 老司机导航亚洲精品导航| 亚洲精品9999久久久久无码| 国产精品久久久一区二区| 亚洲精品成人网久久久久久| 人禽交 欧美 网站| 久久精品视频在线看99| 欧美乱人伦视频在线| 香蕉精品亚洲二区在线观看| 7777久久亚洲中文字幕| 久久国产精品福利一区二区三区| 18?流白浆??小蘑菇| 亚洲色成人网站www永久| 中文字幕人妻中文av不卡专区| 免费无码国模国产在线观看| 人妻熟女一区| 自拍偷自拍亚洲精品第1页| 亚洲AV秘?成人久久无码海归| 成人麻豆亚洲综合无码精品| 亚洲欧洲av无码专区| 高清破外女出血av毛片| 爽爽影院免费观看视频|