国产精品亚洲一区二区在线观看-在线黑人抽搐潮喷-久久人人爽天天玩人人妻精品-亚洲日韩av一区二区三区四区-永久不封国产av毛片

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Wind pressure testing machine

  • Hot Line:18322499311

Highlight-color: rgba(255, 255, 255, 0); margin: 0px; color: rgb(102, 102, 102); font-family: "microsoft yahei", 宋體, Arial; font-size: 14px;">



1、 Main functions of the device:

The Wind pressure testing machine is used to determine whether the equipment can maintain structural integrity and work in high wind speed environments. It is mainly suitable for evaluating equipment working outdoors in mountainous, coastal, island, and other areas, as well as equipment placed on the open deck of ships for work.


2、 Performance indicators and system composition of wind pressure testing machine:


Model GC-FY-80

Sample restrictions: This testing equipment prohibits the testing of flammable, explosive, and volatile substance samples; Testing for storing samples of corrosive substances, testing for storing organisms, testing and storing samples of strong electromagnetic emission sources

Main technical parameters

Environmental conditions for use: ambient temperature of 5-35 ℃, relative humidity ≤ 85% RH

Blow off cross-sectional area 1000mm × 1000mm (fan outlet cross-sectional area)

Wind speed (0-45) m/s (wind speed at the outlet of the fan) adjustable

Air volume: 110600-181800m3/h (1843-3030m3/min)

Wind pressure 951-1402 Pa

Maximum specimen size ≥ 2000mm × 2000mm

The external dimensions of the machine are approximately 4200 × 3700 × 1500mm (W * H * D)

Sample Placement Room

To avoid the influence of surrounding air flow on the wind direction, the sample is placed in a closed room and the laboratory is sufficiently large. The horizontal dimension is at least 3 times the length of the sample placement, and the vertical and vertical dimensions are at least 2 times the length of the sample placement. An automatic pressure relief device or exhaust duct is also installed indoors

Test meets the conditions GJB150.21A-2009 Military Equipment Laboratory Environmental Test Methods Part 21: Wind Pressure Test

GB/T2423.41-94 Basic Environmental testing procedures for electrical and electronic products: Wind pressure test method

Maximum power 75KW

Maximum current of 120A

 

Power supply conditions

And power supply

AC 380V three-phase four wire+protective grounding; The allowable voltage fluctuation range is 10% V;

The allowable frequency fluctuation range is 50 ± 0.5HZ; TN-S power supply or TT power supply

The grounding resistance of the protective grounding wire is less than 4 Ω

Require users to configure corresponding capacity air or power switches for the equipment at the installation site, and this switch must be independently controlled. When placing powered samples in the equipment use box, please use an external power source for the sample power supply and do not directly use the local power supply;

The machine structure adopts a volute centrifugal fan as the power source

The snail shell is made as an assembled type, with a rotating air outlet angle that can be adjusted by ± 90o

Install a lifting frame at the bottom of the fan, which can be raised and lowered vertically with an adjustable range of 0-1000mm

Electrical control system

Centrifugal blower as power source, easy to use and maintain

The speed control of the fan adopts a frequency converter and a variable frequency motor to control the motor speed, achieving the purpose of controlling the wind speed

Requirements for storage, transportation environment, and installation site

Storage environment requirements: The equipment environment temperature should be maintained within 0 ℃ to+35 ℃

The installation site requires that the distance between the left, right, and rear wall panels of the test box and the wall should not be less than 800mm, and the distance between the front and the wall should not be less than 1000mm. When transporting equipment, whether it is possible to enter the entrance or passage, elevator, etc., to avoid affecting the progress of your company's project.

Transportation method: Whole machine transportation



Recommended products

主站蜘蛛池模板: 2020久久超碰国产精品最新| 亚洲18禁| 亚洲中文在线精品国产| 男女做爰猛烈啪啪吃奶动| 久久成人国产精品一区二区| 人妻少妇邻居少妇好多水在线| 国产无遮挡A片又黄又爽小直播| 国产东北肥熟老胖女| 躁躁躁日日躁| 蜜桃av少妇久久久久久高潮不断| 日韩视频在线观看| 中字幕一区二区三区乱码| 亚洲欧洲精品成人久久曰| 少妇高潮一区二区三区99| 亚洲精品午夜久久久伊人| 久久久无码精品亚洲日韩蜜臀浪潮| 好男人社区www在线观看| 色综合久久综合欧美综合网| 国产在线拍小情侣国产拍拍偷| 亚洲精品无码不卡久久久久| 国产亚洲精品美女在线| 久久se精品一区二区三区| 久久不见久久见免费影院视频观看| 亚洲中文精品久久久久久| 777米奇色狠狠俺去啦奇米77| 亚洲中文字幕伊人久久无码| 日本乱偷人妻中文字幕| 人妻无码系列一区二区三区| 欧美成人精品三级网站| 国产女人高潮抽搐喷水免费视频| 色综合伊人色综合网站无码| 无套内谢孕妇毛片免费看| 337p粉嫩日本欧洲亚洲大胆| 精品国产三级| 久久精品国产只有精品96| 正在播放的国产a一片 | 国产精品国三级国产av| 亚洲а∨天堂男人色无码| 久久久久99精品成人片牛牛影视| 中国国语毛片免费观看视频| 国产成人精品午夜福利在线观看|