国产精品亚洲一区二区在线观看-在线黑人抽搐潮喷-久久人人爽天天玩人人妻精品-亚洲日韩av一区二区三区四区-永久不封国产av毛片

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Enthalpy difference laboratory

  • Hot Line:18322499311

Highlight-color: rgba(255, 255, 255, 0); margin: 0px; color: rgb(102, 102, 102); font-family: "microsoft yahei", 宋體, Arial; font-size: 14px;">



 

1、 Product Introduction:


The Enthalpy difference laboratory meets the requirements of GB/T7725-1996 standard and uses the air enthalpy difference method to test the cooling (heating) capacity of air conditioners. It can test the performance of various single - and three-phase window type, split type, and unit type air conditioners. The system is equipped with semi-automatic working condition control, automatic stability judgment, and recording.


Test project


1. Stable state rated cooling;


2. Steady state rated heat pump heating, low-temperature heat pump heating, ultra-low temperature heat pump heating;


3. Customized heating with electric heating capacity;


4. It can also provide environmental conditions for the following types of tests:


5. Maximum operating cooling, minimum operating cooling;


6. Maximum operating heating and minimum operating heating of the heat pump;


7. Condensation;


8. Condensed water;


9. Freeze;


10. Defrost;

 


2、 Test conditions:


Testing standards: National standard GB/T 7725-2004 EN14511、EN14512、ANSI/AHAM RAC-1-2002、ISO5151, And refer to the Japanese JIS 8615 standard


1. Type of tested air conditioner


Window type, split type, cabinet type, dehumidifier, mobile air conditioner, variable frequency air conditioner, dual speed or dual compressor.


2. Allowable load for working condition test


Maximum cooling capacity of 10000W (3 horsepower) air-cooled room air conditioner


3. Range of enthalpy difference test


3 horsepower or less air-cooled room air conditioner


Cooling capacity: 1200~8800 W Heating capacity: 1200~9700 W


Indoor unit air volume: 2-28 m3/min


4. Power supply for the tested air conditioner (voltage and frequency can be remotely controlled, and the voltage drop between power supply wiring is less than 2V)


A junction box (inner and outer) that can be used for both 1 and 3 diameters, and provides two 10A and two 1* sockets at the same time


1 φ: 220V/50Hz, 153~252V/50Hz, 115V/60 Hz, 220 V/60 Hz


3 φ: 380V/50Hz, 220 V/60 Hz


6. Three phase variable frequency power supply 3 φ 4W 30 KVA, the power supply needs to have a remote communication interface (provided by the power supply manufacturer at the time of purchase)


7. Testing accuracy


Comparison with prototype: ≤± 2% (target value: ± 1%), repeatability: ≤± 1%. The test comparison prototype is provided by the user


8. Laboratory operating conditions


Indoor temperature range of 10-50 ℃, measurement ± 0.1 ℃, control ± 0.2 ℃


Humidity 30~85% measurement ± 0.1 ℃ (WB) control ± 0.2 ℃ (WB)


Outdoor temperature -15~55 ℃ measurement ± 0.1 ℃ control ± 0.2 ℃


Humidity 30~85% measurement ± 0.1 ℃ (WB) control ± 0.2 ℃ (WB)

 


3、 The system structure of enthalpy difference laboratory:


1. Size


Dimensions 10000 (W) × 4500 (D) × 3500 (H)


Indoor side dimensions 5500 (W) × 4300 (D) × 3300 (H)


Outdoor dimensions 4500 (W) × 4300 (D) × 3300 (H)


2. Thermal insulation and finishing


Indoor side 100mm t rigid polyurethane foam insulation


100mm t rigid polyurethane foam insulation at outdoor side


100mm t rigid polyurethane foam insulation for partition


Exquisite interior and exterior 0.6mm thick color steel plate


Floor 100mm rigid polyurethane foam insulation, overall foam 2.5mm SUS316 board


3. Other


Door 1200 × 2000 (h) × 2 (revolving flat door)


700 × 2000H × 1 (rotary flat door)


Top pressure relief door


Laboratory window size: 400×500×4;


Four sets of 40W indoor side lighting fluorescent lamps (explosion-proof)


Outdoor side lighting fluorescent lamps 40W, 3 sets (explosion-proof)


100W low-temperature lamp x 2 (explosion-proof)


Backup socket 220V (1*)~2 sets


Pipe hole for testing machine, with a diameter of 110 °× 2 (through partition wall)


4. Central partition wall opening


1000 (W) * 800 (H)


5. 2 sets of temperature and humidity measuring devices


Type: Automatic water supply type, dry wet bulb method


Supply fan 150W 1Π 220V 50HZ multi blade fan (explosion-proof fan)


6. Exterior insulation structure of the laboratory


The function of the external insulation structure of the laboratory is to divide the enthalpy difference laboratory into relatively independent indoor and outdoor environmental chambers in space, thereby ensuring that the laboratory can establish artificial simulation environments that meet testing requirements and are relatively stable in both indoor and outdoor rooms, without interference from the external space. The heat transfer between the internal space and the external environment, as well as between the indoor and outdoor sides of the isolation test room, reduces the loss of cold and heat, lowers the energy consumption for regulating the ambient temperature, and has a significant insulation and energy-saving effect.


7. Air handling unit


The air conditioning treatment system mainly consists of air conditioning cabinets, fans, heaters, humidifiers, refrigeration systems, etc. Its function is to regulate the indoor air state of the enthalpy difference test chamber to achieve the required operating conditions for testing.


8. Temperature and humidity sampling system


The temperature and humidity sampling system mainly includes: temperature sampler, platinum resistor, sampling fan, temperature transmitter


Temperature control instruments and computer measurement systems, etc. Its function is to collect indoor dry and wet bulb temperatures, and outdoor dry and wet bulb temperatures


Wet bulb temperature, air drying and wet bulb temperature, are basic parameters for enthalpy difference method testing.


9. Air flow measurement device


The air volume measuring device consists of an inlet chamber, a nozzle, an exhaust chamber, an exhaust fan, a pressure transmitter, a frequency converter, and a static controller


Composed of pressure control instruments, connecting hoses, and computer measurement systems. Its function is to measure the air flow rate of the test unit, which is also a basic parameter for enthalpy difference method testing.

 


4、 System control system:


The measurement and control system provides users with a convenient measurement and control operation platform, which consists of various measurement and control instruments, transmitters, computers, switches, indicator lights, etc. The main function is to operate the enthalpy difference laboratory control center, ensuring the normal operation of the laboratory.

 


5、 Measurement data acquisition system:


The measurement data acquisition system is a system that collects basic parameters for enthalpy difference method testing, converts the electrical parameters of various sensors into digital quantities, mainly including power meters, pressure transmitters, temperature sensors, etc.


Design of refrigeration load for enthalpy difference laboratory refrigeration system


The refrigeration system of the enthalpy difference laboratory adopts a water coil type variable air volume air conditioning system, which is cooled by a water-cooled chiller unit. Water is used as the refrigerant to perform heat and humidity treatment on the variable air volume air handling unit, ultimately achieving the organic combination, coordinated control, and stable operation of the refrigeration system and the variable air volume air handling system. By designing in this way, it is possible to meet the high cooling capacity of the enthalpy difference laboratory and facilitate temperature regulation. The water-cooled chiller unit has a cooling capacity adjustment function, and the water pipeline system can be adjusted again by adjusting the valve, thus achieving precise control. Avoiding the inconvenience of load adjustment and limited cooling capacity caused by direct evaporation refrigeration, while simplifying system control.



Recommended products

主站蜘蛛池模板: 无码人妻丰满熟妇区五十路百度| 日韩无套无码精品| 2021久久精品国产99国产精品| 国产精品免费看久久久无码| 中文人妻av高清一区二区| 国产精品禁18久久久夂久| 久久午夜夜伦鲁鲁片免费无码影院| 欧美激情肉欲高潮视频| 女的被弄到高潮娇喘喷水视频| 日本老熟妇毛茸茸| 欧美亚洲亚洲日韩在线影院| 亚洲色欲色欲综合网站sw0060| 久久精品九九热无码免贵| 999国产精品999久久久久久| 亚洲成av人无码中文字幕| 无码人妻人妻经典| 中文字幕人妻一区二区三区 | 精品亚洲国产成人a片app| 亚洲欧美洲成人一区二区| 国产精成人品日日拍夜夜免费| 日本www一道久久久免费榴莲 | 中文字幕乱人伦高清视频| 亚洲一区二区三区无码中文字幕| 夜夜爽妓女8888视频免费观看 | 日韩亚洲国产综合高清| 亚洲人成国产精品无码果冻| 无码播放一区二区三区| 国产亚洲精品yxsp| 天天摸夜夜添久久精品| 国产特级毛片aaaaaa视频| 久久五月精品中文字幕| 国产乱国产乱老熟300视频| 97夜夜澡人人爽人人模人人喊| 呻吟国产av久久一区二区 | 国产成人av乱码在线观看| 亚洲a片国产av一区无码| 中文字幕精品av一区二区五区 | 免费精品国产自产拍在线观看| 久久久久国产精品熟女影院| 最新亚洲中文av在线不卡| 久久大香萑太香蕉av|